
NCC 2022 Shower Floor Grading Requirements
NCC 2022, effective from May 2023, revised shower floor grading to be minimum 1:80 to maximum 1:50. This applies to all States and is irrespective

NCC 2022, effective from May 2023, revised shower floor grading to be minimum 1:80 to maximum 1:50. This applies to all States and is irrespective

Brisbane City Council has now published further information about changes to siting variations which can be found at: https://www.brisbane.qld.gov.au/planning-and-building/do-i-need-approval/types-of-approval/building-near-the-boundary

From 1 July 2022, the Council fee for a siting relaxation will increase from $610 to $640. The current $610 fee applies irrespective of the

Builders should be aware that major changes to AS/NZS 3500 will commence on 1 September 2022. These include changes to elevated drainage pipework junctions

The government updated building forms from 1 September 2021 as part of the new Building Regulation 2021. The following forms should now be used by

Brisbane City Council is offering 50% discount on plumbing inspection fees for some new dwellings where their inspections are conducted virtually. The discount applies to

The Brisbane City Council changed its flood level definition on 28 May 2021. The definition now references the 1% probability of flood instead of the

Logan City Council have recently changed their requirements for pool backwash. It is a now a requirement that any swimming pool which uses an aggregate

Moreton Bay Regional Council delays Applications lodged to Moreton Bay Regional Council for plumbing approvals, relaxations and driveways are experiencing delays. Council advised the backlog

Masonry articulation joints The requirements for masonry articulation joints are contained in the 2019 National Construction Code (NCC). Where articulation is beside a window, it