Professional Certification Group

Heavy Rain and On-site Risks

Heavy-rains-and-onsite-risks-PCG-Private-Certifier-Mar22

 

Returning to work after all the recent heavy rain we should be aware that excess water also results in additional on-site risks such as slip hazards and electrocution.

Also, please ensure any pools under construction that have filled with more than 300 mm of water are immediately drained or fenced.

Hopefully we have seen the last of the recent heavy rain and your families and staff have remained safe during these difficult times.

 

 

 

Start Your Quote Process

Full Name(Required)
Files types allowed: pdf, jpg, jpeg, png.
Drop files here or
Accepted file types: pdf, jpg, jpeg, png, Max. file size: 50 MB, Max. files: 4.