Update from Professional Certification Group – Clarification relating to Notifiable Plumbing Work
Notifiable Plumbing Work Clarification – Update by Professional Certification Group
The QBCC has advised that plumbing work on Class 2 to 9 buildings that exceed 2 stories cannot be considered as Notifiable Work. Therefore these buildings will need a plumbing approval from the local Council.
For a full list of what is considered notifiable works, please see the QBCC factsheet at the below link: http://www.qbcc.qld.gov.au/sites/default/files/Schedule_of_notifiable_work.pdf
For further information, please contact Peter O’Brien on 3069 5755.
Brisbane City Council have advised that Fast Track Assessment will cease on 1 July 2022 and be replaced by the standard referral process. The…
Brisbane City Council has issued updated standard drawings for single residential vehicle crossover driveways. The changes require a minimum two metre clearance from the driveway…
The Brisbane City Council changed its flood level definition on 28 May 2021. The definition now references the 1% probability of flood instead of the…